Beswick Drive Watermain Replacement and Road Reconstruction Project

Share Beswick Drive Watermain Replacement and Road Reconstruction Project on Facebook Share Beswick Drive Watermain Replacement and Road Reconstruction Project on X (formerly Twitter) Share Beswick Drive Watermain Replacement and Road Reconstruction Project on Linkedin Email Beswick Drive Watermain Replacement and Road Reconstruction Project link

The Town of Newmarket is conducting infrastructure improvements and road reconstruction on Beswick Drive, (see map below for details). The work includes:

  • Replacement of the watermain;
  • Spot repairs and improvements to sanitary and storm sewer;
  • Installation of new sidewalk on the east side of the road to meet accessibility (AODA) requirements; and
  • Road reconstruction including curb replacement and new asphalt.

Work is expected to begin in late Summer 2026 starting with watermain replacement and sewer spot repairs. Road reconstruction, including new sidewalk installation, is planned for Spring & Summer 2027. The final asphalt lift is anticipated in Spring 2028 to allow time for settlement following the watermain works.

Map of Construction Area

Public Consultation Centre (PCC): Beswick Drive Watermain Replacement and Road Reconstruction Public Meeting

The Town of Newmarket invites residents to attend a drop-in for a Public Consultation Centre (PCC) to learn more about the Beswick Drive Watermain Replacement and Road Reconstruction .

  • When: Tuesday, April 21, 2026, from 6 to 8 p.m.
  • Where: Municipal Offices (395 Mulock Drive) in the Cane A & Cane B Rooms

Drop by anytime to review the design, ask questions and provide feedback. Representatives from the Town’s Engineering Services and the consulting engineers on the project (CIMA+) will be available to answer questions.

The Town of Newmarket is conducting infrastructure improvements and road reconstruction on Beswick Drive, (see map below for details). The work includes:

  • Replacement of the watermain;
  • Spot repairs and improvements to sanitary and storm sewer;
  • Installation of new sidewalk on the east side of the road to meet accessibility (AODA) requirements; and
  • Road reconstruction including curb replacement and new asphalt.

Work is expected to begin in late Summer 2026 starting with watermain replacement and sewer spot repairs. Road reconstruction, including new sidewalk installation, is planned for Spring & Summer 2027. The final asphalt lift is anticipated in Spring 2028 to allow time for settlement following the watermain works.

Map of Construction Area

Public Consultation Centre (PCC): Beswick Drive Watermain Replacement and Road Reconstruction Public Meeting

The Town of Newmarket invites residents to attend a drop-in for a Public Consultation Centre (PCC) to learn more about the Beswick Drive Watermain Replacement and Road Reconstruction .

  • When: Tuesday, April 21, 2026, from 6 to 8 p.m.
  • Where: Municipal Offices (395 Mulock Drive) in the Cane A & Cane B Rooms

Drop by anytime to review the design, ask questions and provide feedback. Representatives from the Town’s Engineering Services and the consulting engineers on the project (CIMA+) will be available to answer questions.

  • Beswick Drive Watermain Replacement and Road Reconstruction Update

    Share Beswick Drive Watermain Replacement and Road Reconstruction Update on Facebook Share Beswick Drive Watermain Replacement and Road Reconstruction Update on X (formerly Twitter) Share Beswick Drive Watermain Replacement and Road Reconstruction Update on Linkedin Email Beswick Drive Watermain Replacement and Road Reconstruction Update link

    The Town of Newmarket would like to thank residents for their participation in the Public Consultation Centre (PCC) held at the Town Offices on April 21, 2026. The project team received valuable feedback during the meeting, as well as through subsequent correspondence regarding the proposed Beswick Drive Reconstruction Project.

    This notice provides an update regarding the proposed sidewalk, as the Town received a range of comments concerning the inclusion of a new sidewalk on Beswick Drive. While some residents expressed concerns about the proposed sidewalk, others supported its installation to improve pedestrian connectivity, safety, and accessibility within the neighbourhood.

    After reviewing public feedback, applicable standards, and project requirements, the Town has decided to proceed with the proposed sidewalk. This decision is based on the Town's obligation to provide an accessible transportation network that complies with the requirements of the

    Accessibility for Ontarians with Disabilities Act (AODA). In addition, the Town's Engineering Design Standards require a sidewalk on one side of all local roads. The Town also received feedback that there is a need to improve accessibility along this street. The addition of a sidewalk will provide a safer and more accessible route for residents of all ages and abilities. It will improve accessibility, enhance pedestrian safety, and better accommodate the mobility needs of residents and road users.

    Accordingly, the sidewalk will remain part of the proposed design and will be incorporated into the final design.

    The Town and its consultant have now completed the design stage of the project. As part of this process, all comments and concerns received from residents were carefully reviewed and considered.

    The next step will be to tender the project for construction and select a contractor to perform the work. Subject to the tender results, some minor construction activities may begin in the fall of 2026; however, the majority of the work is anticipated to take place throughout 2027. The final surface asphalt lift is currently scheduled to be placed in mid-2028.

    The Town will release a Notice of Construction to residents once construction timelines are firm. In addition, the Town will schedule a Public Information Centre (PIC) in the fall to provide residents with information regarding construction timelines, staging, and anticipated impacts.

    We appreciate your continued participation, patience, and cooperation as we work to improve neighbourhood infrastructure.

    The Town of Newmarket would like to thank residents for their participation in the Public Consultation Centre (PCC) held at the Town Offices on April 21, 2026. The project team received valuable feedback during the meeting, as well as through subsequent correspondence regarding the proposed Beswick Drive Reconstruction Project.

    This notice provides an update regarding the proposed sidewalk, as the Town received a range of comments concerning the inclusion of a new sidewalk on Beswick Drive. While some residents expressed concerns about the proposed sidewalk, others supported its installation to improve pedestrian connectivity, safety, and accessibility within the neighbourhood.

    After reviewing public feedback, applicable standards, and project requirements, the Town has decided to proceed with the proposed sidewalk. This decision is based on the Town's obligation to provide an accessible transportation network that complies with the requirements of the

    Accessibility for Ontarians with Disabilities Act (AODA). In addition, the Town's Engineering Design Standards require a sidewalk on one side of all local roads. The Town also received feedback that there is a need to improve accessibility along this street. The addition of a sidewalk will provide a safer and more accessible route for residents of all ages and abilities. It will improve accessibility, enhance pedestrian safety, and better accommodate the mobility needs of residents and road users.

    Accordingly, the sidewalk will remain part of the proposed design and will be incorporated into the final design.

    The Town and its consultant have now completed the design stage of the project. As part of this process, all comments and concerns received from residents were carefully reviewed and considered.

    The next step will be to tender the project for construction and select a contractor to perform the work. Subject to the tender results, some minor construction activities may begin in the fall of 2026; however, the majority of the work is anticipated to take place throughout 2027. The final surface asphalt lift is currently scheduled to be placed in mid-2028.

    The Town will release a Notice of Construction to residents once construction timelines are firm. In addition, the Town will schedule a Public Information Centre (PIC) in the fall to provide residents with information regarding construction timelines, staging, and anticipated impacts.

    We appreciate your continued participation, patience, and cooperation as we work to improve neighbourhood infrastructure.

Page last updated: 30 Jul 2026, 04:09 PM