Project Update - Bristol Road

Project Update #7 - Bristol Road (Week of December 2nd)

  • Paving of Bristol Road, Jack Rettie Court and Ashworth Drive have been completed

Work scheduled for the next two weeks:

  • Placement of temporary line painting. Permanent line painting will be completed in Spring of 2025
  • Minor restoration work where sidewalks were replaced


Project Update #6 - Bristol Road (Week of November 18th)

  • Asphalt grinding has finished on Bristol Road
  • Manhole adjustments have been completed
  • Driveway restorations are underway

Work scheduled for the next two weeks:

  • Repairing base course asphalt
  • Paving
  • Line painting of newly paved road


Project Update #5 - Bristol Road (Week of November 11th)

  • Asphalt grinding has began on Bristol Road
  • Manhole adjustments are taking place so they will be flush with new asphalt

Work scheduled for the next two weeks:

  • Continuing Manhole adjustments
  • Continuing Asphalt grinding
  • Paving
  • Line painting of newly paved road


Project Update #4 - Bristol Road (Week of November 5th)

  • All sidewalk replacements have been completed along Bristol Road
  • All curb replacements have been completed
  • Ashworth Drive curb and sidewalk work is complete
  • Sod restorations are being completed
  • As advised to residents, a 500 meter section of Bristol between Chester Ave and Main Street will have resurfacing postponed until 2025

Work scheduled for the next two weeks:

  • Manhole adjustments
  • Asphalt grinding and paving
  • Line painting of newly paved road


Project Update #3 - Bristol Road (Week of October 21st)

  • All sidewalk replacements have been completed along Bristol Road
  • The majority of curb replacements have been completed
  • Ashworth Drive work is under way

Work scheduled for the next two weeks:

  • Top soil being placed in disturbed areas
  • Asphalt grinding and paving


Project Update #2- Bristol Road (Week of September 30th):

  • Sidewalks and curbs replacements have been completed along the south side of Bristol Road
  • Crews are working along north side of Bristol Road and will take approximately 1-2 more weeks to complete concrete work on north side of Bristol Road

Work scheduled for the next two weeks:

  • Continuing curb and sidewalk replacements on the north side of Bristol Road
  • Catch basin adjustments
  • Backfilling areas with topsoil to be restored with sod


Project Update #1 - Bristol Road (Week of September 9th):

  • Concrete crew is onsite at Bristol Road
  • Sidewalks and curbs are being removed and replaced along the south side of Bristol Road
  • Sidewalks have been poured at both Dr. J.M. Denison Secondary School entrances

Work scheduled for the next two weeks:

  • Move concrete work from the south side of Bristol Road to the north side
  • Catch basin adjustments