Project Update - Bristol Road
Project Update #7 - Bristol Road (Week of December 2nd)
- Paving of Bristol Road, Jack Rettie Court and Ashworth Drive have been completed
Work scheduled for the next two weeks:
- Placement of temporary line painting. Permanent line painting will be completed in Spring of 2025
- Minor restoration work where sidewalks were replaced
Project Update #6 - Bristol Road (Week of November 18th)
- Asphalt grinding has finished on Bristol Road
- Manhole adjustments have been completed
- Driveway restorations are underway
Work scheduled for the next two weeks:
- Repairing base course asphalt
- Paving
- Line painting of newly paved road
Project Update #5 - Bristol Road (Week of November 11th)
- Asphalt grinding has began on Bristol Road
- Manhole adjustments are taking place so they will be flush with new asphalt
Work scheduled for the next two weeks:
- Continuing Manhole adjustments
- Continuing Asphalt grinding
- Paving
- Line painting of newly paved road
Project Update #4 - Bristol Road (Week of November 5th)
- All sidewalk replacements have been completed along Bristol Road
- All curb replacements have been completed
- Ashworth Drive curb and sidewalk work is complete
- Sod restorations are being completed
- As advised to residents, a 500 meter section of Bristol between Chester Ave and Main Street will have resurfacing postponed until 2025
Work scheduled for the next two weeks:
- Manhole adjustments
- Asphalt grinding and paving
- Line painting of newly paved road
Project Update #3 - Bristol Road (Week of October 21st)
- All sidewalk replacements have been completed along Bristol Road
- The majority of curb replacements have been completed
- Ashworth Drive work is under way
Work scheduled for the next two weeks:
- Top soil being placed in disturbed areas
- Asphalt grinding and paving
Project Update #2- Bristol Road (Week of September 30th):
- Sidewalks and curbs replacements have been completed along the south side of Bristol Road
- Crews are working along north side of Bristol Road and will take approximately 1-2 more weeks to complete concrete work on north side of Bristol Road
Work scheduled for the next two weeks:
- Continuing curb and sidewalk replacements on the north side of Bristol Road
- Catch basin adjustments
- Backfilling areas with topsoil to be restored with sod
Project Update #1 - Bristol Road (Week of September 9th):
- Concrete crew is onsite at Bristol Road
- Sidewalks and curbs are being removed and replaced along the south side of Bristol Road
- Sidewalks have been poured at both Dr. J.M. Denison Secondary School entrances
Work scheduled for the next two weeks:
- Move concrete work from the south side of Bristol Road to the north side
- Catch basin adjustments