Project Update #7- Clearmeadow Boulevard (Week of December 2nd)
- Due to unfavorable temperatures for paving, road resurfacing is postponed until spring 2025.
- Driveway and boulevard restorations ongoing. To be completed by Early December (likely late this week or early next week)
- A review of the resorted areas will be done in Spring 2025, and any areas that are not completed to the Towns satisfaction will be replaced.
Project Update #6- Clearmeadow Boulevard (Week of November 25th)
- Curb removal and replacements are complete.
- Driveway and Sod restorations ongoing. To be completed by Early December.
- Due to unfavorable temperatures for paving, road resurfacing is likely to be postponed until spring 2025. However, if an unseasonably warm day occurs in December, paving may proceed at that time. As it stands, the work is tentatively scheduled for spring 2025.
Project Update #5- Clearmeadow Boulevard (Week of November 18th)
- Curb removal and replacements are ongoing throughout Clearmeadow. Anticipated to be completed this week.
- Driveway restorations and placement of topsoil and sod will commence in the next week or two.
- Road paving is tentatively scheduled for the next 2 weeks- weather permitting. Should weather not allow for paving this year, then paving will be deferred to Spring 2025.
Project Update #4 - Clearmeadow Boulevard (Week of November 11th)
- Curb removal and replacements have begun throughout Clearmeadow.
- Sidewalk removals and replacements are still underway along south side of Clearmeadow. The majority of the north side sidewalk work has been completed.
- After completion of curb and sidewalk work, road grinding and manhole adjustments will begin- anticipated to start in 1-2 weeks, weather permitting.
Project Update #3 - Clearmeadow Boulevard (Week of November 4th)
- Crews have began sidewalk removal and replacements along the north side of Clearmeadow. Once complete, they will move to the south side of Clearmeadow and begin sidewalk removal and replacements on the south side.
- After sidewalk removal and replacements are completed on the north and south sides of Clearmeadow, curb removals will begin.
Project Update #2 - Clearmeadow Boulevard (Week of October 28th)
- Crews will begin work on Clearmeadow this week, below is a summary of the upcoming work:
-
Curb Replacement: Concrete crews will be mobilizing on-site this week to begin curb replacement work along Clearmeadow Boulevard. You may see crews saw-cutting and removing sections of curb throughout the area. This is expected to take approximately 2–3 weeks to complete.
-
Road Grinding and Manhole Adjustments: Once curb replacements are complete, the contractor will proceed with grinding the road surface and adjusting manholes to prepare for paving.
-
Sidewalk Replacements: Weather permitting, sidewalk replacements may also take place this year. If weather conditions do not allow, this work will be postponed until next year. We will keep you informed with additional updates on the timing for sidewalk replacements
Project Update #1 - Clearmeadow Boulevard
- Please be advised that the start of Clearmeadow Boulevard Resurfacing has been slightly delayed and the project is now expected to begin in late October. We appreciate your understanding and will provide further updates as needed.
Share Project Update - Bristol Road on Facebook
Share Project Update - Bristol Road on Linkedin
Email Project Update - Bristol Road link
Project Update #7 - Bristol Road (Week of December 2nd)
- Paving of Bristol Road, Jack Rettie Court and Ashworth Drive have been completed
Work scheduled for the next two weeks:
- Placement of temporary line painting. Permanent line painting will be completed in Spring of 2025
- Minor restoration work where sidewalks were replaced
Project Update #6 - Bristol Road (Week of November 18th)
- Asphalt grinding has finished on Bristol Road
- Manhole adjustments have been completed
- Driveway restorations are underway
Work scheduled for the next two weeks:
- Repairing base course asphalt
- Paving
- Line painting of newly paved road
Project Update #5 - Bristol Road (Week of November 11th)
- Asphalt grinding has began on Bristol Road
- Manhole adjustments are taking place so they will be flush with new asphalt
Work scheduled for the next two weeks:
- Continuing Manhole adjustments
- Continuing Asphalt grinding
- Paving
- Line painting of newly paved road
Project Update #4 - Bristol Road (Week of November 5th)
- All sidewalk replacements have been completed along Bristol Road
- All curb replacements have been completed
- Ashworth Drive curb and sidewalk work is complete
- Sod restorations are being completed
- As advised to residents, a 500 meter section of Bristol between Chester Ave and Main Street will have resurfacing postponed until 2025
Work scheduled for the next two weeks:
- Manhole adjustments
- Asphalt grinding and paving
- Line painting of newly paved road
Project Update #3 - Bristol Road (Week of October 21st)
- All sidewalk replacements have been completed along Bristol Road
- The majority of curb replacements have been completed
- Ashworth Drive work is under way
Work scheduled for the next two weeks:
- Top soil being placed in disturbed areas
- Asphalt grinding and paving
Project Update #2- Bristol Road (Week of September 30th):
- Sidewalks and curbs replacements have been completed along the south side of Bristol Road
- Crews are working along north side of Bristol Road and will take approximately 1-2 more weeks to complete concrete work on north side of Bristol Road
Work scheduled for the next two weeks:
- Continuing curb and sidewalk replacements on the north side of Bristol Road
- Catch basin adjustments
- Backfilling areas with topsoil to be restored with sod
Project Update #1 - Bristol Road (Week of September 9th):
- Concrete crew is onsite at Bristol Road
- Sidewalks and curbs are being removed and replaced along the south side of Bristol Road
- Sidewalks have been poured at both Dr. J.M. Denison Secondary School entrances
Work scheduled for the next two weeks:
- Move concrete work from the south side of Bristol Road to the north side
- Catch basin adjustments